JOHN MARTIN DAM, Colo. – A contractor ropes team scales the nose pier on the upstream side of the dam, Nov. 8, 2022. Three-person ropes team installed instrumentation cables and conduit up the face of the dam from borings in the lake, assisted by a dive team. Photo by Chris Carroll. This photo tied for third place based on employee voting.