Lasting Legacy: A Father and Son’s Role in Building, Maintaining Trinidad Dam
For approximately four years (1968-1972), the Trinidad Control Tower stood alone until negotiations over water rights were resolved and construction could resume on the dam.

Download Image: Full Size (1.03 MB)
Photo by: courtesy Rick Torres |  VIRIN: 700101-A-A1412-1001.JPG