Farmers Acequia Project
Rock scalers secure mesh draping that will protect the construction team during the installation of a pipeline on the Farmers Acequia project near Farmington, NM, Jan. 15, 2024. The photo was taken from the Farmers Acequia access road.

Download Image: Full Size (1.37 MB)
Photo by: Chris Carroll, USACE-Albuquerque District |  VIRIN: 240115-A-A1412-1002.JPG