Trinidad Gate Operating Chamber
TRINIDAD DAM, Colo. -- This photo was taken just after the installation of a new sump pump and the replacement of packing glands in the Trinidad Dam Tower, Feb. 2, 2022. Photo by Joshua Ellison, civil engineer, Operations Support Branch. This photo tied for second place based on employee voting.

Download Image: Full Size (3.06 MB)
Photo by: Joshua Ellison |  VIRIN: 220202-A-A1412-011.JPG