2015 Photo Drive - Erosion Channel Construction
ROSWELL, N.M. – Construction of an erosion channel at the District’s Two River’s project outside Roswell. Photo by Gary Cordova, March 8, 2015. This was a 2015 Photo Drive entry.

Download Image: Full Size (1.35 MB)
Photo by: Gary Cordova |  VIRIN: 150314-A-CE999-001.JPG