Jemez Dam road work
JEMEZ DAM, N.M. – Due to concerns that moving equipment into the area downslope of the culvert might damage cultural resources, the BLM crew used long-reach equipment from above to repair the culvert, Mar. 2, 2017.

Download Image: Full Size (1.05 MB)
Photo by: Bureau of Land Management |  VIRIN: 170302-A-CE999-001.JPG